[google-translator]

Roof Top Pools

All our pools can be above ground. Perfect for rooftops, hotels, and balconies. 

All our pools can be above ground. Perfect for rooftops, hotels, and balconies.

Option 1

  • Choose one of our flat bottom fiberglass

    pools from our factory manufactured pools delivered to the site & installed by crane on the rooftop. Filtration connected, pool filled with water ready for swimming & surrounds within 2 days.

  • Construction methods for above ground bracing vary from country to country below is one version of above-ground construction

Option 2

  • Roof Top Pools fully tiled & constructed on site tailor-made to any size required.

  • Construction time approximately 10 days ready for tiling.

  • These pools are perfect for Hotels and Apartment blocks who did not include a pool in the initial construction.

  • Also perfect for a person wholes a 3 or 4 story

    Town House and would like Thier own personal pool on top of Thier building available in all sizes from small to big.

  • Suitable for installation on existing Rooftops, Apartments, Hotel, Guesthouses & Mezzanines.


FACTORY MADE FIBREGLASS POOLS

  • 3 Days Installation- Ready for swimming

  • Reasonable Prices

  • No heavy Concrete Construction

  • Quick installation

  • Easy maintenance

  • Low chemical costs

 

For more details, please send us an contact Bob at

E:      swimspas@gmail.com

M:   +66 84-336-5905


 


Submit

Comments are closed.

DutchEnglishFrenchGermanNorwegianRussianSwedishThai